BACK TO HOME

.

  COMMERCIAL
.
              OFFICES
.
         CHURCHES
.
                BANKS
.

  MULTI    FAMILY..
.

 COMMUNITIES
.
    RESIDENTIAL
.
.HEALTH CARE
.
.RENOVATIONS
.
.

   3604 SOUTH COOPER..ST
  SUITE 100
    ARLINGTON TX 76015
      (682) 667-0044

Southlake Boulevard Presbyterian Church- Southlake, Tx. A Phase 1 building of 10,880 sf containing a gym/ worship center with office and classroom spaces. The exterior is brick with a stone watertable. Cost of the project was about 
$ 1,200,000.00 in 2001. A master plan was also developed for the church.
.



Highland Meadows Christian Church- Colleyville, Tx.
A Phase 2 building addition of 27,600 sf containing a classroom space for all children and youth grade levels. The exterior matches the existing structure in concrete brick and champagne colored glass. Cost of the project was about $ 1,750,000.00 in 1998 .

                                                    Back    

Next